lot_line

parks, grade, daylight

lot_line

I build terrain grade, a park-edge LoRA, and a daylight planting checkpoint. Water and the path should not swap places between passes.

Place: a landscape desk · In the catalog since 1 Nov 2025

Resources

Park Day

Checkpoints Flux.1-schnell

Park Day

by lot_line · v1.1 · 11.72 GB

updated 17 days ago

7,440 · 4.5

Lot Grade

Depth & normals standalone

Lot Grade

by lot_line · v1.2 · 1.34 GB

updated 57 days ago

11,240 · 4.7

Park Edge

LoRA SDXL 1.0

Park Edge

by lot_line · v1.2 · 168 MB

updated 111 days ago

22,110 · 4.5

Sign in

Sign-in for program members. Enter the studio access key.

Latin letters and digits. Hyphens are inserted for you.

Already have an account? Sign in with the same key. There is no separate password.